Tunnel and infrastructure support works
Tunnel and heavy infrastructure support rarely offer “easy” conditions: limited access, high safety demand and a tight schedule. On the Absheron project SANY equipment was chosen to keep work precise and safe.
Challenges
Narrow access and strict safety rules constrained machine choice. At the same time material flow could not stop. Too large a machine meant risk; too small meant lost tempo.
Solution
A SANY fleet balancing maneuverability with lifting/earthmoving needs was deployed. Daily briefings, zone separation and planned service reduced stoppages.
Safety measures
- Zone separation and access control
- Short briefings before critical operations
- Daily visual machine checks
- Parts and service response plan
Result
Work tempo stayed stable, safety incidents stayed at zero and unplanned downtime fell. The right-model + local-service equation proved itself.
For your infrastructure job
Contact SANY Azerbaijan for equipment selection on complex-zone and tunnel support works.
Gallery
6 photos
We provide SANY fleets and local service support for earthworks, assembly and material handling.